The A34 southbound closes from Milton to Chilton, 9pm Friday 27 November to 6am Monday 30 November. Lodge Hill lights stay on 24 hours a day to 18 December.

The A34 southbound between Milton and Chilton is closed all weekend, from 9pm on Friday 27 November to 6am on Monday 30 November, National Highways’ closure report says. That is the stretch south of Milton Interchange towards Newbury, and the closure is for improvement works.

The A34 southbound between Hinksey Hill and Marcham, the main road home from Oxford, is closed overnight, 9pm to 6am, on the nights of Tuesday 24 to Friday 27 November for resurfacing. It shuts again on weekday nights from 3 December.

On the A4183 at Lodge Hill, two-way temporary lights are in place 24 hours a day until 18 December, the county council says.

Last checked against the source notices on 24 November 2026.

The A34: southbound closures this week

National Highways’ seven-day closure report, last updated at 3.31pm on 23 November, runs from Monday 23 to Sunday 29 November. From tonight it lists these closures near Abingdon:

A34 closures near Abingdon, 24 to 30 November 2026
StartingWhat is closed
Tuesday 24 November, 9pm to 6amSouthbound, Hinksey Hill to Marcham; northbound at Peartree, between the exit and entry slip roads
Wednesday 25 November, 9pm to 6amSouthbound, Hinksey Hill to Marcham
Thursday 26 November, 9pm to 6amSouthbound, Hinksey Hill to Marcham
Friday 27 November, 9pm to 6amSouthbound, Hinksey Hill to Marcham
Friday 27 November, 9pm, to Monday 30 November, 6amSouthbound, Milton to Chilton, all weekend

The county council’s Lodge Hill page describes the same weekend differently: a full closure of the A34 from Hinksey Interchange to Chilton Interchange from 9pm to 6am on Friday 27 November, then the southbound side between Milton and Chilton closed on Saturday 28 and Sunday 29 November. It does not say which direction the Friday night closure covers. Neither source we read gives the diversion for the Milton to Chilton weekend.

The resurfacing carries on into December. National Highways’ South East maintenance schemes page gives the Peartree to Hinksey Hill resurfacing as running from 21 November to 18 December, all southbound and all 9pm to 6am:

  • 3 to 11 December: Hinksey Hill to Marcham, weekday nights only
  • 14 to 16 December: Peartree to Hinksey Hill
  • 17 and 18 December: Hinksey Hill to Marcham, weekday nights only

For the Peartree to Hinksey Hill nights, the signed diversion runs east on the A40 along the Oxford ring road, south on the A4142 at Headington Roundabout, then west on the A423 at Heyford Hill Roundabout, back onto the A34. The page gives no diversion for the Hinksey Hill to Marcham nights.

The northbound barrier scheme between Marcham and Lodge Hill reached its end date, 23 November, and the closure report lists no northbound closure on that stretch this week. National Highways says closures can change at short notice.

Steventon Hill and Milton Hill: closed at night from 1 December

The county council has made the order (TTRO reference 514, made 16 November) for resurfacing by M Group as part of the Steventon Lights scheme:

  • Steventon Hill closes from 8pm on Tuesday 1 December to 6am on 2 December. The diversion is via the B4017 High Street and Drayton Road, the A415 Marcham Road, the A34 and the Milton Interchange roundabout.
  • Milton Hill, the A4130 between Milton Interchange and Abingdon Road, closes from 8pm on Thursday 3 December to 6am on 12 December. The diversion is via the A34, the A4185 Newbury Road and the A4130 Abingdon Road.

Oxford Bus Company’s service updates page had no entry for either closure when we read it on 24 November, so we cannot yet say how the X2, NX2 and X36 will divert.

Lodge Hill: lights on the A4183 to 18 December

The county council’s Lodge Hill page says that from 23 November until 18 December, two-way temporary lights are in place on the A4183 between the entrance to the Lodge Hill garage and the start of the new south roundabout, running 24 hours a day.

The overnight closures of the A4183 at Lodge Hill and on Oxford Road, which Oxford Bus Company listed until 23 November, are over: neither appears on its service updates page any more. The Peachcroft roundabout works by David Wilson Homes are complete, the council said on 18 November.

In town: Christmas events close two centres this weekend

Both come from Oxford Bus Company’s service updates page.

  • Abingdon High Street is closed to traffic from 4pm to 7pm on Saturday 28 November for the Abingdon Christmas Extravaganza. The 6, 33, 44, X2, X3, X15 and X35 divert via East St Helen Street and West St Helen Street and miss stop A7 on the High Street; the operator suggests Stratton Way instead.
  • Wantage Market Place is closed from 7am to 5pm on Sunday 29 November for the Wantage Christmas Market. The X35 diverts via Seesen Way, Grove Street and Grove Road to Mably Way, missing the Market Place, Fitzwaryn School and Whittington Crescent stops in both directions.

The A4183 speed limit has changed permanently

Two separate speed limits now apply on the Abingdon to Oxford road, and only one of them is temporary.

On 7 September the county council made the Kennington and South Hinksey (Speed Limits) (No.2) Order 2026, which came into force on 14 September. It introduces a 40mph limit on the A4183 Oxford Road in its entirety, replacing the previous 50mph, from the Dunmore Road and Twelve Acre Drive roundabout at Abingdon, through Bagley Wood, to the existing 40mph south of Hinksey Hill. The council made it in support of the Lodge Hill scheme, and the scheme’s own page lists the drop from 50mph to 40mph as one of the things being delivered.

Inside the works themselves the limit is lower again. Abingdon Town Council’s road closures page says a 30mph limit is in force on the A4183 between Sugworth Lane and the Lodge Hill garage, with signs in place.

Other roads closed or restricted now

Each of these comes from an Oxfordshire County Council order published in full on the Public Notice Portal, from Abingdon Town Council’s road closures page, from the council’s own scheme pages, or from the bus operator.

Road closures and restrictions near Abingdon, as checked 24 November 2026
WhereWhatUntil
Unnamed road at Besselsleigh, from Besselsleigh Road to the A420Proposed closure, 9.30am to 3.30pm, for drainage works. We have read the proposal but no made order27 November (proposed)
Bow Road, Stanford in the Vale (Stanford House to Chapel Road)Closed for culvert repairs; diversion via the B4508, Cottage Road and Faringdon Road. The notice gave about two months from 1 September, which has run out; no later notice we have read, to 24 November, confirms whether it has reopenedUnconfirmed
Coxwell Road link to the A420, Great Coxwell (near Faringdon)Closed 24 hours a day while a signal-controlled junction is built; diversion via the A420, London Street, Coxwell Street and Coxwell Road. Speed limits either side of the junction cut to 30mph16 April 2027
Footpath 207/9/20 at the Cradle Bridge, Radcot (Great Faringdon parish)Closed from 11 October because the bridge "is unsafe and requires repair"; order made 5 October (reference 921). A temporary diversion runs over neighbouring private land31 August 2027
A420, Littleworth to Kingston Bagpuize and LongworthNew 50mph limit replacing 60mph, eastwards from west of Wadley Lodge to beyond the central reservation crossing at Kingston Bagpuize; new 40mph limits on Faringdon Road, Spring Hill and Pine Woods Road nearby. Permanent order made 12 OctoberPermanent, in force now
Milton Heights, Turn bus stop (towards Didcot and Harwell Campus)Suspended for construction works; BB1, NX2, ST1, X2, X2S, X24 and X36 use a temporary stop nearbyUntil further notice
A415, Culham to Clifton Hampden60mph cut to 40mph over about 2,500 metres for the HIF1 works31 January 2028
A415 Abingdon Road, Clifton Hampden40mph from South Cottage to High Street, then 20mph to Thame Lane31 August 2027
Thames Valley Path at Culham (footpath 183/11/80) and Appleford bridleway 106/3/10Closed for the Didcot to Culham river crossing30 November 2027

Since our last check on 20 November, the Bath Street closure outside number 1 reaches its end at 4pm today, 24 November, and the East Hendred bus stop suspension for the BB4 has passed its 23 November end date. The Public Notice Portal carries no Oxfordshire traffic notice newer than the 18 November batch. Abingdon Town Council’s road closures page returned a verification screen on 24 November and could not be read, so nothing on this page relies on it for a current date.

Hampden Road in Wantage and the East Hendred water main closure are still missing from every notice we can read, so treat both as unconfirmed.

For the A415 limits and why they are there, see our Clifton Hampden report.

New double yellow lines in Botley from 12 October. The county council made a permanent order on 5 October to “deter all day parking by commuters or visitors to the Westminster Way area of Botley”. It brings in no waiting at any time on parts of Westminster Way, Hurst Rise Road, Cumnor Hill and West Way, Finmore Road, Springfield Road, St Paul’s Crescent, The Garth and nearby roads. The order is on the Public Notice Portal, and the full plans are on Let’s Talk Oxfordshire.

Bus changes near Faringdon. Oxford Bus Company’s service updates page says that from 28 September to 16 April 2027 the 67’s 07:55 departure from Faringdon cannot serve the stops along Coxwell Road. The operator points passengers to the Stagecoach 66 shuttle instead.

Trains: no Paddington this weekend. GWR’s planned engineering page says rail work affects all services for London Paddington on Saturday 28 and Sunday 29 November. Its London trains run to Euston instead but cannot pick up or set down between Euston and Swindon, including at Oxford and Didcot Parkway. GWR still runs trains between Maidenhead and Didcot Parkway, and between Reading and Oxford. Paddington also closes from Sunday 27 December to Sunday 3 January, GWR says. Our Christmas closure report has the routes into London that week, and our trains to London page covers which station to use the rest of the time.

A lorry ban proposed for the A4183 at Kennington

Oxfordshire County Council has proposed a 7.5 tonne weight limit for goods vehicles on two roads, as a result of the Lodge Hill junction. Its notice on the Public Notice Portal names:

  • A4183 Oxford Road, Kennington, from Foxcombe Road and Hinksey Hill to the roundabout at the northern Lodge Hill slip roads.
  • Hinksey Hill, South Hinksey, from the Hinksey Hill Interchange roundabout to Foxcombe Road.

Deliveries to premises on those roads, the emergency services and utility works would be exempt. This is a proposal, not a made order. The objection period on Let’s Talk Oxfordshire closed on 23 October; we found no made order in the Oxfordshire notices we read to 4 November.

Botley Road has reopened

Botley Road, the main western approach into central Oxford, reopened on Sunday 20 September 2026 after being shut at the railway bridge since April 2023 for Network Rail’s Oxford station rebuild.

Oxfordshire County Council’s reopening page carries the detail that matters if you have not driven it since 2023:

  • The new bridge has a 4.4 metre height clearance, signed out as far as the ring road.
  • All buses using Botley Road now run through to Oxford city centre, instead of terminating either side of the bridge.
  • Two four-metre walkways run under the bridge, one each side. The walkways are two-way; the cycleways are one-way, so cycle into town on the northern side and out of town on the southern side.
  • A new footbridge links Becket Street car park to the front of Oxford station.

Two jobs nearby are not finished. Thames Water is still repairing its mains pipe at Osney Bridge on Botley Road, nights only, 8pm to 6am with a lane closure, and no completion date has been published. Separately, the council closed the Swan Street footbridge over Osney Stream on 24 September after its inspectors raised safety concerns. The walking diversion runs from West Street to Botley Road and back round to Ferry Hinksey Road, which the council says adds about 10 minutes. On 5 October the council made an order continuing the closure, with an anticipated completion date of 17 March 2028.

The reopening also triggered the biggest change to Vale bus services in years, on the same day. Our bus changes report has the route-by-route detail.

Oxford’s traffic filters started on 28 September

Oxfordshire County Council’s traffic filter trial replaced the temporary congestion charge on Monday 28 September.

What changed:

  • You can no longer pay £5 to drive through a filter. Cars need a permit; every other type of vehicle can pass at all times.
  • Vale residents get 25 day passes a year. Residents inside the Oxford permit area get 100. Existing permits transferred automatically.
  • Every part of Oxford can be reached without a filter, now Botley Road is open, though the council says “you may need to take an alternative route”.
  • The penalty is £70, reduced to £35 if paid within 21 days. For the first six months, a first contravention brings a warning rather than a fine.

The six filters and their hours are unchanged:

  • Marston Ferry Road and Hollow Way: Monday to Saturday, 7am to 9am and 3pm to 6pm.
  • Hythe Bridge Street, St Cross Road, St Clement’s Street and Thames Street: every day, 7am to 7pm.

You can have your say. The council’s consultation on the trial is open until 28 March 2027, online at Let’s Talk Oxfordshire or on paper at County Hall and Oxfordshire libraries. Our permits explainer covers the day passes in detail.

Coming up: the next few weeks

These are booked in orders and notices. Items marked proposed are at the stage before an order is made, so treat them as intentions.

  • A34 southbound, Milton to Chilton: closed from 9pm on Friday 27 November to 6am on Monday 30 November, per National Highways.
  • Abingdon High Street: closed 4pm to 7pm on Saturday 28 November for the Christmas Extravaganza, per Oxford Bus Company.
  • Wantage Market Place: closed 7am to 5pm on Sunday 29 November for the Christmas Market, per Oxford Bus Company.
  • A34 southbound, Hinksey Hill to Marcham: closed 9pm to 6am on weekday nights from 3 to 11 December, and Peartree to Hinksey Hill on 14 to 16 December, per National Highways.
  • Hobbyhorse Lane byway, Sutton Courtenay (BOAT 373/9/10): closed from 2 November to 2 May 2027 while The Transportation Consultancy Ltd builds the estate road for a 175-home development. Order made (reference 977); diversion signed locally.
  • A34 southbound lay-bys, Peartree to Marcham: closed in phases, 24 hours a day, for carriageway repairs under National Highways order NH/SE/2026/A34/85. The work was expected to last about six weeks from 2 November. The main carriageway is not closed by this order.
  • Appleford Drive, Abingdon: Abingdon Town Council’s page listed a closure on 27 November for Paragon Traffic Management (case 904) when we read it on 29 October. The page could not be read on 24 November and we have found no county order for it, so treat this date as unconfirmed.
  • Summertown, East Hanney (outside Downsview): closed 30 November to 2 December, 9.30am to 3.30pm, for drainage works by M Group Highways. Order now made (TTRO reference 716). Diversion via Main Street and Oxford Road.
  • Kings Lane, Longcot, near Faringdon (outside Wellington Farm gate): proposed closure 30 November to 2 December for Thames Water. Diversion via the A420 and the B4508.
  • Bridleway 100/35/10 at Pickering Close, Abingdon: closed for surfacing works by the county council from 30 November to 28 May 2027, but only while work is taking place and “Footpath Closed” signs are up. Order made (TTRO reference 877); a diversion will be signed locally.
  • Steventon Hill: closed from 8pm on 1 December to 6am on 2 December (TTRO 514).
  • Milton Hill (A4130): closed from 8pm on 3 December to 6am on 12 December (TTRO 514). Details and diversions are in the Steventon Hill section above.
  • Two footpaths off Pagisters Road, Abingdon: closed from 7 December for gas main replacement expected to take six weeks. One runs east from Corn Avill Close to Pagisters Road (T18415/MR), the other from Pagisters Road to Radley Road (T18416/MR). Alternative routes signed locally.
  • High Street, Cumnor (from the junction to outside number 54): proposed closure from 7 December for gas main replacement by J&G Contractors. The notice gives the completion date as 18 December 2027, a year after the start. We cannot confirm whether that year is a misprint, so treat the end date as unconfirmed. Diversion northbound via Oxford Road, Glebe Road, the B4017, the A420 and the B4044.
  • Kennington Road, Radley (at the Thomas Crouch Drive junction): proposed closure at night from 9pm on 11 January to 6am on 17 January 2027 for resurfacing and speed cushions (reference 1219). Diversion via The Avenue, Hinksey Hill, Oxford Road, Twelve Acre Drive, Radley Road and Whites Lane.
  • Eaton Road, Appleton: proposed closure of the whole road on 15 January 2027, 9.30am to 3.30pm, before surface dressing (reference 1303). Diversion via Eaton, Besselsleigh and the A420.
  • Sheepstead Road, Marcham: proposed closure from 18 January to 2 February 2027 for M Group Water valve and meter works (reference 1275). Diversion via North Street, the A415 Frilford Road, the A338 Oxford Road and Faringdon Road.
  • Radley Road, Abingdon (from Twelve Acre Drive): proposed closure from 29 March to 23 April 2027 for SGN gas replacement (reference 862). Diversion via Whites Lane, Kennington Road, the A423, the A34 and the A4183.

Stage 6 of Lodge Hill brings overnight closures of the A4183 from 8pm to 6am for final surfacing, and then the new junction opens. The council’s page gives no nights for those closures yet. On 18 November the council moved completion to early spring 2027, although its Lodge Hill page, read on 24 November, still says “Winter 2026”.

A34 Lodge Hill: the junction now due in spring 2027

The A34 junction at Lodge Hill has only ever had north-facing slip roads. Oxfordshire County Council is building south-facing slips, with traffic calming on local roads and an upgraded southbound layby at Harwell. Balfour Beatty is the contractor, and Homes England’s infrastructure fund is among the funders.

Main construction began on 3 September 2025. The council’s page lists stage 4 (summer and autumn 2026) as widening of the A4183 southbound, realignment of the northbound on slip and work on both new roundabouts, with temporary signals for some jobs. On 18 November the council said stages one to three are complete, stage four is almost complete and stage five is about to start. Work on the south roundabout runs through December up to Christmas, and the scheme is now due to be complete in early spring 2027, not before Christmas as hoped. The council said the Peachcroft roundabout works by David Wilson Homes are complete. Most work runs 7.30am to 6pm, Monday to Friday, with nothing on Sundays or public holidays.

Where to check what is shut today

Parking in Abingdon: what it costs in 2026

Vale of White Horse District Council froze car park fees for 2026/27 at its cabinet meeting in February 2026, so the tariffs set on 1 April 2025 still apply. There are two price scales, and the difference between them over a working day is £2.

Charging periods are Monday to Saturday, 8am to 6pm in all pay and display car parks. Rye Farm, Hales Meadow and Abbey Close also charge on Sundays, 10am to 5pm. The first hour is free everywhere.

Vale of White Horse council car park charges in Abingdon, 2026
StayAbbey Close, Cattle Market, Civic, West St Helen StAudlett Drive, Rye Farm, Hales MeadowCharter multi-storey (levels 1 and 2, short stay)
Up to 1 hourFreeFreeFree
Up to 2 hours£2.00£1.50£2.00
Up to 3 hours£3.00£2.00£3.00
Up to 4 hours£4.00£3.00—
Up to 5 hours£5.00£3.50—
Up to 6 hours£6.00£4.00—
Over 6 hours£7.00£5.00—

The free first hour is worth knowing if you are heading to the Market Place. It covers the County Hall Museum and most of the town-centre attractions comfortably.

The Charter multi-storey is short stay only, up to three hours, and only levels 1 and 2 are on that tariff. If your car is removed from it, the vehicle release fee is £55.

If you park all day for work, buy a permit rather than a ticket. Audlett Drive and Rye Farm annual permits are £780, or £65 a month. The town-centre permit covering Abbey Close, Cattle Market and West St Helen Street is £1,092 a year, or £91 a month. Over 230 working days, the £780 permit works out at about £3.39 a day against £5 on the ticket machine.

The same two scales run in Wantage (Portway and the Mill Street Undercroft on the higher scale, Limborough Road A and B on the lower) and in Faringdon, where Gloucester Street is on the higher scale and Southampton Street gives two hours free before charging £3 for three.

Driving into Oxford: use Redbridge, and buy the £3 ticket

The nearest park and ride to Abingdon is Redbridge, on Old Abingdon Road, OX1 4XG, straight up the A4144 at the end of the A34 run. It has 1,070 bays, 20 of them accessible, and Oxford Bus Company’s service 300 runs into the city centre.

The ticket changed on 17 August 2026. Free park and ride bus travel has ended. In its place, a £3 combined ticket covers up to 16 hours of parking plus return bus travel into Oxford for up to five people of any age.

The details that catch people out:

  • Buy it at the car park machine or on the RingGo app, and select the Parking & Bus option for £3. It is not applied automatically.
  • It is valid on any Stagecoach, Oxford Bus Company or Thames Travel bus stopping inside a park and ride site, not only the named park and ride services.
  • It is not valid on Oxford Bus Company’s Airline services or the Oxford Tube.
  • It is not valid for journeys away from Oxford. You cannot use it to travel from Redbridge to Abingdon.
  • It is available at Redbridge, Pear Tree, Seacourt, Thornhill and Oxford Parkway.

Parking on its own is free for the first hour, then £2.50 for up to 16 hours, £4.50 for 16 to 24 hours, £8.50 for 24 to 48 hours and £12.50 for 48 to 72 hours. For a family of five the £3 ticket is a straight saving. For a lone commuter it is 50p more than parking alone used to cost.

If your journey ends in London rather than Oxford, the sums are different again. The three stations that serve Abingdon, their journey times and the £6,692 season ticket are on our trains to London page.

Frequently asked questions

Why are there traffic lights on the Oxford Road in Abingdon?

The county council has two-way lights on the A4183 at Lodge Hill for its A34 junction scheme. Its Lodge Hill page says they are in place 24 hours a day from 23 November until 18 December, between the Lodge Hill garage entrance and the new south roundabout. The separate Peachcroft roundabout works by David Wilson Homes are complete, the council said on 18 November.

Is the Oxford Road in Abingdon closed at night?

Not now. The overnight closures of Oxford Road and Lodge Hill that Oxford Bus Company listed ran until 23 November, and its service updates page no longer shows them. The council’s Lodge Hill page says the final stage will bring more overnight closures of the A4183, 8pm to 6am, but gives no dates yet.

Is the A34 closed near Abingdon?

Yes, southbound at night this week. National Highways’ report lists the A34 southbound between Hinksey Hill and Marcham as closed from 9pm to 6am on the nights of Tuesday 24 to Friday 27 November. The same stretch closes again on weekday nights from 3 to 11 December.

Is the A34 closed this weekend?

Southbound between Milton and Chilton, yes, all weekend. National Highways lists it closed from 9pm on Friday 27 November to 6am on Monday 30 November. The county council’s Lodge Hill page describes a full closure from Hinksey to Chilton on the Friday night. We have not found a published diversion.

Is Steventon Hill closed?

On the night of 1 December. The county council’s order closes it from 8pm on 1 December to 6am on 2 December, before Milton Hill, the A4130, closes from 8pm on 3 December to 6am on 12 December.

Is Botley Road open?

Yes. It reopened on Sunday 20 September 2026, after closing at the railway bridge in April 2023. Thames Water is still working on its mains at Osney Bridge, nights only from 8pm to 6am with a lane closure, and no finish date has been published.

Can I still pay to drive through Oxford’s traffic filters?

No. The traffic filter trial replaced the temporary congestion charge on 28 September, and the £5 payment option has gone. Cars need a permit. Residents of the Vale and the rest of Oxfordshire get 25 day passes a year, against 100 for residents inside the Oxford permit area.

How much is parking in Abingdon?

The first hour is free in every council car park. After that it is £2 for two hours in Abbey Close, Cattle Market, Civic and West St Helen Street, or £1.50 in Audlett Drive, Rye Farm and Hales Meadow. All day costs £7 on the first scale and £5 on the second. Fees are frozen for 2026/27.

Is Sunday parking free in Abingdon?

In most council car parks, yes. Charging periods run Monday to Saturday, 8am to 6pm. The exceptions are Rye Farm, Hales Meadow and Abbey Close, which also charge on Sundays from 10am to 5pm.

Sources

Roadworks dates move. Everything above was checked against the source notices on 24 November 2026; confirm on the National Highways report or one.network before relying on a date.